Sherlock changelog

Next scheduled maintenance: Jan. 31

by Sherlock Team
Sherlock 2.0 will not be available on Wednesday, January 31st, 2018 from 8:00am to 2:00pm System maintenance and upgrades will be performed during this time. Access to Sherlock 2.0 will be unavailable, logins will be disabled and jobs...
Maintenance

New login nodes

by Sherlock Team
Two new login nodes, sh-ln03 and sh-ln04 are now available to connect to Sherlock 2.0. They've been added to the load-balanced DNS pool and will automatically be selected according to their load and the number of currently logged-in...
Improvement
Hardware
New

Next scheduled maintenance: Dec. 12

by Sherlock Team
Sherlock 2.0 will not be available on Tuesday, December 12th, 2017 from 8:00am to 2:00pm System maintenance and upgrades will be performed during this time. Access to Sherlock 2.0 will be unavailable, logins will be disabled and jobs...
Maintenance

Next scheduled maintenance: Sept. 20

by Sherlock Team
Sherlock will not be available on Wednesday, September 20 2017 between 9:00 am and 2:00 pm. System maintenance and upgrades will be performed during this time. Access to Sherlock will be unavailable, logins will be disabled and jobs won...
Maintenance

GPUs now available on Sherlock 2.0

by Sherlock Team
The new gpu partition has just been open for production on Sherlock 2.0. It currently features two kinds of accelerators: NVIDIA Tesla P100-PCIe GPUs, for applications requiring double-precision (64-bit) and deep-learning training...
New
Hardware

New Lustre routers in production

by Sherlock Team
Two new Lustre routers have been put in production on Sherlock 2.0, one to serve /scratch, and the other one to serve /oak. Immediate benefits will be higher availability of the filesystems on Sherlock 2.0 clients, and doubled bandwidth...
Improvement
Hardware